top of page

MELEHY TEAM/PROJECTS/INSULATION AND CLADDING WORKS

Projects - Insulation & Cladding Works

A) Project: HRSG boiler piping, Steam drum, Blow down tank, Evaporator, Steam
                    transformer and all related piping for desalination plant


End-user: Fujairah Asia Power Company (FAPCO), F-2, Fujairah, UAE

B) Project: Thermal insulation & cladding Work for Nooter Eriksen make HRSG boiler,
                    pipe lines, steam ejector, steam drum, blow down tank and chimney with total
                    capacity of 220 ton/hr; steam pressure 24 bar @ 250 ° C


End-user: Federal Electricity & Water Authority (FEWA)
Customer: Nooter Eriksen Srl

C) Project: Thermal insulation and cladding work for MED’s ejector compressors, steam
                    transformers and related piping works with desalination water capacity 133 MIGD


End-user: Fujairah Asia Power Company (FAPCO), F-2, Fujairah, UAE
Customer: SIDEM

D) Project: Removal and Installation of Insulation and Liner Plates at L2 Stn, Jebel Ali


End-user: Dubai Electricity & Water Authority (DEWA)


E) Project: Removal and Installation of Insulation from Valves, Pipes and Ducts for
                   Integrity Inspection in E-Stn Jebel Ali


End-user: Dubai Electricity & Water Authority (DEWA)

Boiler Works

Piping Works

Painting and Blasting Works

Refurbishment, Repair and Overhauling Works

Insulation and Cladding Works

Scaffolding Works

Instrumentation Works

bottom of page