top of page

PROJECT                              Fabrication / Erection / Painting / pumps /

                                               Conveyors for Food Oil
CLIENT                                 Al Ghurair Oil Mills

SCOPE OF WORK               Supply of manpower, tools, equipment’s, consumable,

                                               materials and technical expertise necessary for fabrication

                                               and installation related to the mechanical works.

YEAR                                     2011

PROJECT                              Boiler Repair Works
CLIENT                                 Shuweihat CMS  International Power Company (SIPCO) at Ruwais

SCOPE OF WORK               Removal of existing damaged baffle plates and replacement

                                               with new baffle platesfor HRSG including the supply of

                                               manpower, tools, equipment’s, consumables and materials.  

YEAR                                     2011

PROJECT                              Fabrication / Erection / Painting / pumps /

                                               Conveyors for Food Oil
CLIENT                                 Al Ghurair Oil Mills

SCOPE OF WORK               Supply of manpower, tools, equipment’s, consumable,

                                               materials and technical expertise necessary for fabrication

                                               and installation related to the mechanical works.

YEAR                                     2012

PROJECT                              Pickling / Passivation for water Desalination unit
CLIENT                                 Fujairah Asia Power Company (FAPCO)

SCOPE OF WORK               Pickling and Passivation works for 8 nos. of MED's with

                                               desalination capacity of 11 MIGD each.

YEAR                                     2012

PROJECT                              Gas Turbine Overhauling of  IGV
CLIENT                                 Al Mirfa Power Plant

SCOPE OF WORK               Modification of Inlet Guide Vanes of V64.3 Ansaldo make

                                               Gas Turbine with the supply of manpower and material.

YEAR                                     2012

PROJECT                              Battery Banks and Charger
CLIENT                                 Sharjah Electricity & Water Authority (SEWA) at Kalba

SCOPE OF WORK               Supply, Installation, Testing & Commissioning of

                                               250 AH Battery Banks & Battery Chargers.

YEAR                                     2013

PROJECT                              Scaffolding Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Outsourcing of Scaffolding Services and Material at Jebel Ali

                                               and Aweer Stations.

YEAR                                     2013

PROJECT                              Boiler Insulation Work
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Renewal of GT Exhaust Duct and Boiler Internal Insulation.

YEAR                                     2014

PROJECT                              Boiler Maintenance Works
CLIENT                                 Shuweihat CMS International Power Company (SIPCO) at Ruwais

SCOPE OF WORK               Removal and Installation of Baffle Plates.

YEAR                                     2014

PROJECT                              MV Motor Stands with Sandblasting and Painting
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Fabrication and supply of MV Motor Stands with Rubber Lining.

YEAR                                     2014

PROJECT                              Boiler Maintenance Works
CLIENT                                 Shuweihat CMS International Power Company (SIPCO) at Ruwais

SCOPE OF WORK               Removal and Installation of Baffle Plates.

YEAR                                     2014

PROJECT                              Scaffolding Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Outsourcing of Scaffolding Services and Material at Jebel Ali

                                               and Aweer Stations.

YEAR                                     2014

PROJECT                              Refurbishment Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Refurbishment of Parts for EGT1 & 2 Frame 6 Gas Turbines

                                               and Kanis Frame 5 at Madinat Zayed PS.

YEAR                                     2015

PROJECT                              Refurbishment Works
CLIENT                                 Al-Mirfa Power Company Abu-Dhabi

SCOPE OF WORK               Refurbishment of Parts for Brown Boveri Company (BBC)

                                               Type 9D! (ABB) Gas Turbine.

YEAR                                     2015

PROJECT                              Fire and Gas Detection and Protection Job
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Replacement of the existing fire and gas detection protection

                                               system of GT noise enclosures including installation, testing

                                               and supply of  materials.

YEAR                                     2015

PROJECT                              Scaffolding Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Outsourcing of Scaffolding Services and Material at Jebel Ali

                                               and Aweer Stations.

YEAR                                     2015

PROJECT                              Piping & Painting Works
CLIENT                                 Al Mirfa Power Company

SCOPE OF WORK               Supply and Installation of diesel fuel oil pipe lines

                                               for GT units 11 & 12.

YEAR                                     2015

PROJECT                              Piping & Painting Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Replacement of small bore piping for NGPRS System

                                               in Phase-II, E-Station, Jebel Ali.

YEAR                                     2015

bottom of page