PROJECT                              Painting Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Surface preparation and Painting of Stel Structure & Walkways                                                 of the Seal Pit Area of CEST #85/86 at 'L' Station, Phase II                                                   Jebel Ali.

YEAR                                     2017

PROJECT                              Manpower Supply
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Skilled manpower services for power station equipment                                                      Overhaul works at D, E, G, H, K, L & M Stations                                    

YEAR                                     2017

PROJECT                              Tank Gauging Project on Diesel Tanks
CLIENT                                 Federal Electricity & Water Authority (FEWA) at Jebel Ali

SCOPE OF WORK               Supply, Installation, Testing And Commissioning                                                                               of 4 Diesel Tanks At Zohra Plant, Ajman

                                              with supply of radar level transmitters, temperature sensors

                                              and transmitters, pressure transmitters, hub units,

                                              Field bus modem, Tank master software, PC and accessories

YEAR                                     2017

PROJECT                              Manpower Supply
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Skilled manpower services for power station equipment                                                      Overhaul works at D, E, G, H, K, L & M Stations                                    

YEAR                                     2016

PROJECT                              Boiler Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Design, Supply and Installation of FCD, First Stage Duct Burners                                                 And Gas Baffles of HRSG 71, 72 & 73 at ‘L’ Station phase-1,                                                   Jebel Ali.

YEAR                                     2016

PROJECT                              Refurbishment Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Replacement of air vent pipe from deaerator to air ejector

                                               pre-condenser At D-station desalination plants units #7 & 8

                                               at Japs.                                    

YEAR                                     2016

PROJECT                              Scaffolding Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Outsourcing of Scaffolding Services and Material

                                               at Jebel Ali and Aweer Station.

YEAR                                     2016

PROJECT                              Boiler Insulation Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Removal and Installation of Insulation and Liner Plates

                                               at L2 Stn. 

YEAR                                     2016

PROJECT                              Boiler Insulation Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Removal and Installation of Insulation from Valves, Pipes

                                               and Ducts For Integrity Inspection in E-Stn.

YEAR                                     2016

PROJECT                              Boiler Insulation Works
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Renewal of GT Exhaust Duct and Boiler Internal Insulation.

YEAR                                     2016

PROJECT                              Chiller sampling system and Flow meters
CLIENT                                 Dubai Electricity & Water Authority (DEWA) at Jebel Ali

SCOPE OF WORK               Modification and installation of Chiller sampling system for

                                               HRB having capacity 220 ton per hour for Frame 9

                                               GE Gas Turbine. Including dismantling of existing

                                               diesel flow meters for repairing, replacement of spares,

                                               calibration and re-installation at Nakheel, Dhaid, Ajman

                                               and Umm-Al- Quwain Power Plants.

YEAR                                     2016