PROJECT Painting Works
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Surface preparation and Painting of Stel Structure & Walkways of the Seal Pit Area of CEST #85/86 at 'L' Station, Phase II Jebel Ali.
YEAR 2017
PROJECT Manpower Supply
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Skilled manpower services for power station equipment Overhaul works at D, E, G, H, K, L & M Stations
YEAR 2017
PROJECT Tank Gauging Project on Diesel Tanks
CLIENT Federal Electricity & Water Authority (FEWA) at Jebel Ali
SCOPE OF WORK Supply, Installation, Testing And Commissioning of 4 Diesel Tanks At Zohra Plant, Ajman
with supply of radar level transmitters, temperature sensors
and transmitters, pressure transmitters, hub units,
Field bus modem, Tank master software, PC and accessories
YEAR 2017
PROJECT Manpower Supply
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Skilled manpower services for power station equipment Overhaul works at D, E, G, H, K, L & M Stations
YEAR 2016
PROJECT Boiler Works
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Design, Supply and Installation of FCD, First Stage Duct Burners And Gas Baffles of HRSG 71, 72 & 73 at ‘L’ Station phase-1, Jebel Ali.
YEAR 2016
PROJECT Refurbishment Works
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Replacement of air vent pipe from deaerator to air ejector
pre-condenser At D-station desalination plants units #7 & 8
at Japs.
YEAR 2016
PROJECT Scaffolding Works
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Outsourcing of Scaffolding Services and Material
at Jebel Ali and Aweer Station.
YEAR 2016
PROJECT Boiler Insulation Works
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Removal and Installation of Insulation and Liner Plates
at L2 Stn.
YEAR 2016
PROJECT Boiler Insulation Works
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Removal and Installation of Insulation from Valves, Pipes
and Ducts For Integrity Inspection in E-Stn.
YEAR 2016
PROJECT Boiler Insulation Works
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Renewal of GT Exhaust Duct and Boiler Internal Insulation.
YEAR 2016
PROJECT Chiller sampling system and Flow meters
CLIENT Dubai Electricity & Water Authority (DEWA) at Jebel Ali
SCOPE OF WORK Modification and installation of Chiller sampling system for
HRB having capacity 220 ton per hour for Frame 9
GE Gas Turbine. Including dismantling of existing
diesel flow meters for repairing, replacement of spares,
calibration and re-installation at Nakheel, Dhaid, Ajman
and Umm-Al- Quwain Power Plants.
YEAR 2016