top of page
MELEHY TEAM/CONTRACTUAL WORKS AND FIELD SERVICES/PIPING WORKS
Contractual Works and Field Services- Piping Works
A) Project: Replacement of air vent pipe from deaerator to air ejector pre-condenser at
D-station desalination plants units #7& #8, Jebel Ali
End-user: Dubai Electricity & Water Authority (DEWA)
B) Project: To replace existing NG Pipe Line (CS) with new CS Pipes
(Dia:12, 10, 8, 6, 4, 3 Inches) from main header inlet reducer to boiler burner inlet
line flange at Ph-I Aux. Boiler units B-2A & B-2B including all mountings &
attachments in ‘E’ Station, Jebel Ali
End-user: Dubai Electricity & Water Authority (DEWA)
C) Project: Renewal of LFO pipelines on high level pipe rack at ‘E’ Stn, Phase II,
Jebel Ali
End-user: Dubai Electricity & Water Authority (DEWA)
D) Project: Supply and Installation of diesel fuel oil pipe lines for GT 11 & 12
End-user: Al Mirfa Power Company
Boiler Works
Piping Works
Painting and Blasting Works
Refurbishment, Repair and Overhauling Works
Insulation and Cladding Works
Scaffolding Works
Instrumentation Works
bottom of page